IFB 22-04: NEWPORT PELL BRIDGE PIER 5W GIRDERS TEMPORARY SHORING AND BEARINGS REMOVAL AND REPLACEMENTS
This Contract shall consist of work performed on Newport/Pell Bridge. The work to be performed includes the following as outlined in the Contract Drawings and the Contract Specifications:
- Fabrication and Installation of temporary shoring at Pier 5W at two girders
- Removal and replacement of existing rocker bearings with new disc bearings at the two girders at Pier 5W
Work to be performed under daily closures of the eastbound and/or westbound travel lanes provided by the RITBA.
Check back often for the official bid posting and accompanying documents.
Recent Comments